If some photos / pictures / drawings are not loading, then we recommend to use VPN services
Showing posts with label maintenance. Show all posts
Showing posts with label maintenance. Show all posts

10/01/2013

Preventive maintenance of the bridge manoeuvring system

The bridge manoeuvring system does not require maintenance due to its design, yet it would be an advantage if the below mentioned items were checked occasionally.
Preventive maintenance of the bridge manoeuvring system

Safety Panel. Activate the "Test shut-down" and "Test slow-down" one at a time, and check that the appropriate white lamps immediately light up strongly. The test buttons should be activated (pushed) for at least 20 s in order to initiate the appropriate functions.

If you want to motivate authors to continue creating content for engineers and ETOs, you can donate using the link: >>> BUY COFFEE
Thanks for the donation and see you on our projects!