19/04/2023

Procedure of restoring of power after black out on the vessel (example)

Vessel has 3 Main Diesel Generators; Power is supplied by one DG under normal operation at sea and in port. The other two DG is in place on 1st Standby and 2nd Standby accordingly. 

Black out test
Power is restored after a blackout in the following process: 

AFTER A POWER BLACK OUT, EMERGENCY GENERATOR IN AUTO STAND BY STARTS UP AUTOMATICALLY AND POWER CAN BE BACK UP BY EMERGENCY GENERATOR IN LESS THAN 15 SECONDS. 

(E/G is started by battery power. If it not starts automatically, we have to manually start by switching to "MANUAL" mode position and Push Engine "START BUTTON" switch.) 

28/11/2021

Blackout Recovery Procedure on a Vessel (short instruction)

A blackout on a vessel is a complete loss of electrical power, which affects all systems and equipment dependent on the ship's power supply.

Blackout recovery on the vessel (short instruction)

This situation can be critical, affecting the vessel’s propulsion, navigation, communication, lighting, and safety systems. Blackouts can occur due to various reasons, including mechanical failures, fuel supply issues, overloads, or faults in the electrical distribution system.

10/01/2013

What is a Shaft Generator? Automatic Control of the Shaft Generators

When the order is issued for the main engine to operate at a constant speed corresponding to the correct frequency, and if the load on the distribution network is not in excess of the maximum permissible load on the shaft generator, and if no alarm is operative on the shaft generator, this combination of conditions is indicated on the control panel by the "shaft generator ready" lamp lighting up.
Automatic Control of the Shaft Generators
The generator then rotates at the correct speed although without excitation, i. e. it generates no voltage.

If the change-over switch on the control panel is set to the "shaft generator on" position the generator will be excited and will generate a voltage. When about 85% of the normal voltage is attained, control of excitation shaft generator will be taken over by the voltage regulator in the switchgear.

Automatic Control System (Power Management System) of Electrical Power Plants

Automatic Control System for Ships Electrical Power Plants. The automatic control system is designed for controlling turbo- and diesel-driven electric generating plant, predominently onboard ships.
Automatic Control System (Power Management System) of Electrical Power Plants
The purpose of the automatic control equipment is to ensure that the power demand of a ship is generated in an economical manner and also to ensure that any faults occurring will not cause damage to the machinery.

During fully automatic operation the equipment carries out starting, synchronizing and load sharing on one or several diesel alternators as the power demand increases, as well as disconnecting and stopping the diesel alternator in the event of excessive power being available.

Power Plant Control System Operation of Central Unit

Adjustable level detectors determine at which busbar load a generator shall start or stop. According to the starting sequence, selected with push-buttons at the front, start and stop orders are distributed to the basic units.
Power Plant Control System Operation of Central Unit
These orders are delayed one minute in order to prevent actions by temporary load variations. The delay will be bypassed when a fault occurs on a running set, overload is detected or a controlled load is required.

The unit also determines whether or not the number of connected sets is sufficient to cover the required load under normal conditions. In this case a signal to the units will permit a set with a non-critical fault to be disconnected and stopped. This signal will also permit a requested controlled load to be connected.